The report summarises the EnFAIT-driven upgrades required for additional instrumentation to turbines T1-T3 to capture information regarding turbine loads and performance.
The turbine upgrades are a pre-requisite to Phase 2 of the operation of the array in EnFAIT: Operation of the three upgraded turbines.
Author: Guy Paine CEng, Electrical Engineer, Nova Innovation